Six columns

Four of them make tonnes. Two of them exist so that the four can be checked: one with no sorbent in it at all, one held permanently full. Neither control is ever counted toward a removal.

ColumnRoleIn service CyclesHeel mmol/gNote
C-4 production 2025-11 4,180 0.061 The reference column. Every cycle on the front page is this one.
C-5 production 2025-11 3,905 0.058 Run to the same schedule as C-4. Logs on request.
C-6 production 2025-06 6,720 0.079 Oldest bed on site. The heel has been climbing since March and it is next out.
C-7 production 2026-05 1,140 0.052 Fresh charge of BR-4, commissioned in May.
Blank control 2025-11 212 0.000 No sorbent. Same air, same three hours, same meters. Nothing adsorbs and nothing is recovered.
Saturated control 2026-02 96 1.250 A bed held at equilibrium with outdoor air and never regenerated. It removes nothing, for the opposite reason.

What a column is

A steel vessel holding 82 kg of BR-4, a fan, a heater and a vacuum line. One cycle takes 210 minutes including turnaround and delivers 4.06 kg of carbon dioxide. Four of them running the year round is 40.7 tonnes, which is a small plant and we describe it as one.

The run logs below are printed the same way as the front page: the weight of each heading is the loading on that bed at that moment. On the two controls, nothing moves.